- Page 1
- Page 2 - Page 3 - Page 4 - Page 5 - Page 6 - Page 7 - Page 8 - Page 9 - Page 10 - Page 11 - Page 12 - Page 13 - Page 14 - Page 15 - Page 16 - Page 17 - Page 18 - Page 19 - Page 20 - Page 21 - Page 22 - Page 23 - Page 24 - Page 25 - Page 26 - Page 27 - Page 28 - Page 29 - Page 30 - Page 31 - Page 32 - Page 33 - Page 34 - Page 35 - Page 36 - Page 37 - Page 38 - Page 39 - Page 40 - Page 41 - Page 42 - Page 43 - Page 44 - Page 45 - Page 46 - Page 47 - Page 48 - Page 49 - Page 50 - Page 51 - Page 52 - Page 53 - Page 54 - Page 55 - Page 56 - Flash version © UniFlip.com |
![]()
taming the flood | the ondjiva paradox
Legend
Formal Housing Informal Housing Government Education
Top Ondjiva City proposed Land Use Bottom Drainage works were proposed based on Urban and Infrastructure Master Plan to serve as a tool for implementation of Integrated Urban and Infrastructure Programs for the City of Ondjiva, over a 25 years horizon.
Health Industrial Commercial Tourist Social / Cultural Religious Sport Utilities Park
Legend
Proposed Channel (0.6x0.6) Proposed Channel (0.76x0.76) Proposed Channel (1.00x0.5) Proposed Channel (1.00x0.76) Proposed Channel (1.00x1.00) Proposed Channel (1.25x1.00) Proposed Channel (1.50x1.00) Proposed Channel (2.00x1.00) Flow Direction
3
Phase Number District Limit Proposed Dike Proposed Culvert Proposed Culvert with Flat Gate 1Ø1000 Natural Earth Cahnnel Discharge to Natural Water Courses Flooded Areas Clear Area To Drain Water
43
|