pearl jumairah development | dubai remarkable recovery Project Phasing Phase I: Update of the Master Plan Phase II: Detailed Master Planning Phase III: Detailed Infrastructure Design Phase IV: Tender Documents Phase V: Tendering and Tender Award Phase VI: Supervision of Construction Pearl Jumairah is a 77-ha reclaimed island located close to Dubai Dry Docks. Our initial scope for Palm Jumairah was to review and validate the existing master plan, we then developed in the final integrated road and infrastructure network design serving the whole project with design carried out in our Beirut design office and our area office in Dubai coordinating with local authorities and Meraas. The project is a mixed-use island with allocation for 280 residential plots and provision for hotels, beaches, a promenade, parks, and community and retail facilities. With Master Plan validation completed and final design and tender documents issued we worked with Meraas through the tender evaluation, contract negotiation and awarding. With Non Objection Certificates granted for the wet utilities, and road and electrical works granted, go ahead and initial mobilization started in early April, 2012. Scope of Work Project Teams • Validation of the revised Master • Marine Consultant COWI Plan to meet Dubai Municipality • Environmental Consultant GHD requirements • Traffic impact consultant CRHI • Preparation of the final design • Master Plan reviewers Dar Al for authorities Handasah • Tender documents for roads and infrastructure services Dar Disciplines • Tender analysis assistance • Town Planning • Contract documents preparation • MEP Engineering • Infrastructure systems • Civil Engineering • Road works • Architectural Design • Bridge crossing the flushing • Structural Engineering canal • Ground Engineering • Wet infrastructure (Water, • Transportation Engineering Firefighting, Irrigation, • Resources and Environmental Stormwater, Wastewater) Engineering • Power supply and street lighting • Telecommunication 35