- Page 2 - Page 3 - Page 4 - Page 5 - Page 6 - Page 7 - Page 8 - Page 9 - Page 10 - Page 11 - Page 12 - Page 13 - Page 14 - Page 15 - Page 16 - Page 17 - Page 18 - Page 19 - Page 20 - Page 21 - Page 22 - Page 23 - Page 24 - Page 25 - Page 26 - Page 27 - Page 28 - Page 29 - Page 30 - Page 31 - Page 32 - Page 33 - Page 34 - Page 35 - Page 36 - Page 37 - Page 38 - Page 39 - Page 40 - Page 41 - Page 42 - Page 43 - Page 44 - Page 45 - Page 46 - Page 47 - Page 48 - Page 49 - Page 50 - Page 51 - Page 52 - Page 53 - Page 54 - Flash version © UniFlip.com |
![]()
cairo international airport
Ofï¬cially inaugurated by the Egyptian President Hosni Mubarak on 18th December, 2008 Terminal 3 will open to passenger service this year
Services provided: Project management for 211,000 m² of built-up area including a three-level main building with mezzanines housing 110 check-in desks, 15 gates and 23 passenger boarding bridges. Works also include taxiways, passenger bridges, apron control tower, power plant, electrical substations, ï¬re hydrant system, ï¬re stations including water storage tanks and pumping stations, landside surface car-parking area, landside bridges/flyovers serving the trafï¬c to/from the terminal building, and a new access road connecting Terminal 3 to Greater Cairo Ring Road.
|